The most realistic estimate of the time required to complete an activity is referred to as​ what?
a. slack time
b. optimistic time
c. most likely time
d. pessimistic time

Respuesta :

sydneybottom
sydneybottom sydneybottom
  • 11-01-2018
I would say B. optimistic time
Answer Link

Otras preguntas

There are 550 people at a basketball tournament. 1/3 of the adults and 1/5 of the children wear basketball jerseys. The number of adults and children not wear
A person who wants to keep the economic, political, and social structures of society in place with minimal government involvement is a ___ A. Conservative.
is an isosceles trapezoid below x=
Find the solution set of this inequality |11x - 22| > 22 Need help ASAP!!
What part of a bacterial cell is used tomake recombinant DNA?A.)cell wallB.)plasmidC.)nucleusD.)gamete​
let f(x)=x^2-2x+2 and g(x)=x-3 find f(x)•g(x)
Hypovolemia is a condition in which a person has low levels of blood volume in their body. Which might be a reason for hypovolemia? A) poor diet B) dehydratio
At Random Stationary, the sales records of 24 employees were examined. Twelve of the employees worked the morning shifts and 12 of them worked the afternoon shi
Part A a national achievement test is administered annelida to third graders. The test has a mean score of 100 and a standard deviation of 15. if Jane z-score i
Xavier, who has a negative explanatory style, is most likely to get depressed after failing a math test if he believes that he failed because a. he is not good