tomdarren2449 tomdarren2449
  • 11-06-2021
  • Business
contestada

What is the total cost to move products between work centers A and D, and between work centers B and C combined

Respuesta :

Munali Munali
  • 14-06-2021

Answer:

More than $0 but less than or equal to $100.

Explanation:

The transportation cost is $2.

Load summary is AB = 12, AC = 25, AD = 12, BC = -19, BD = 21, CD = 34.

The total cost to move product between A and D and B and C combined is ;

A and D = 12 * $2 = $24

B and C = 19 * $2 = $38.

Answer Link

Otras preguntas

If the amplitude of the resultant wave is twice as great as the amplitude of either component wave, and this wave exhibits reinforcement, the component waves mu
Why are some foods, such as chicken and cooked rice, called potentially hazardous foods?
How do you work out 77 divided by 1.54
Complete this sentence: Ellos no toman a. tambor. b. leche. c. gato. d. llave.
Elias says the problem below is an addition problem vladmir says it is a multiplication problem explain why both boys are correct Milo practices piano 2-3 hour
Which is a cleaner source of energy? Fission or Fusion? Why?
The length of the hypotenuse of a right triangle is 20 feet and the length of one leg is 16 feet find the length of the other leg
If the mean rainfall for New York City was 3.4 inches per month what was the total rainfall for the year?
an experiment is designed so you can observe the difference between the experimental group and the _ ?
what would the sum of -18-(-12) be?