lakaylah09 lakaylah09
  • 11-09-2020
  • Mathematics
contestada

A standard working day is 8 hours. If you were to work 125% of a normal day, how many total hours would you work?

Respuesta :

cb0782 cb0782
  • 11-09-2020

Answer:

10

Step-by-step explanation:

Answer Link
jensenaldrich01
jensenaldrich01 jensenaldrich01
  • 11-09-2020

Whenever we see "of" we know its multiplication

125% x a normal day

125% x 8

[tex]\frac{125}{100}[/tex] x 8

10

:)

Answer Link

Otras preguntas

Here's a story problem...."Rita's wants to estimate the number of beans in a large jar.  She takes out 100. she takes out 100 beans and marks them. Then she ret
At the begining of 6 grade the ratio of number of the advanced math students to the number of regular students was 3:8. However after taking the placement tests
if arctan(3/5)=K    Tan(k)=?
How do you find the perimeter of a dented square?
At the begining of 6 grade the ratio of number of the advanced math students to the number of regular students was 3:8. However after taking the placement tests
if arctan(3/5)=K    Tan(k)=?
if arctan(3/5)=K    Tan(k)=?
At the begining of 6 grade the ratio of number of the advanced math students to the number of regular students was 3:8. However after taking the placement tests
How do you find the perimeter of a dented square?
How do you find the perimeter of a dented square?