williamsjasmine williamsjasmine
  • 10-05-2016
  • Mathematics
contestada

If 4 people can stain a deck in 2 days, how many people would be required to stain the deck in only 1 day?

Respuesta :

juju3911
juju3911 juju3911
  • 10-05-2016
8 people could stain a deck in one day.
Answer Link
littlemojo101
littlemojo101 littlemojo101
  • 10-05-2016
the answer to this is 8
Answer Link

Otras preguntas

What is the mass of a 8.45 m3 piece of copper?
in what year did the us last experience double digit inflation?
Unit 8 homework 4 geometry question 13
besides trade routes what else caused diffusion on monotheistic religion’s?
Name two ways that these two historians differ in their assessment of the West as a potential site for slavery's expansion. ( charles W ramsdell and stacey L sm
Ideally, a motorist should try to enter an expressway lane ____________ answer choices - on the exit ramp - at a slower speed than the traffic already on the ex
Which product is generally LEAST influenced by geographics? OA OB. scuba gear OC. video games OD.winter coats snow chains
At what ordered pair will the function f ( x ) = √ x + 2 - 2 begin on the coordinate plane? ( ? , ?)
lines AB and BC are perpendicular. the dashed rays bisect angles ABD and CBD. explain why the measure of angle EBF is 45 degrees.
Maysol made 75 bracelets this month. Last month she made 40 bracelets. What is the percent of change