jadnefigueroa jadnefigueroa
  • 11-04-2022
  • Mathematics
contestada

It took Azul 1.75 hours to bike The Blue Mountain Trail
Azul averaged 12.5 miles per hour. What is the best
estimate for the length of the trail?

It took Azul 175 hours to bike The Blue Mountain Trail Azul averaged 125 miles per hour What is the best estimate for the length of the trail class=

Respuesta :

phoquockhang123 phoquockhang123
  • 11-04-2022
We have length= speed x time
=> 1.75x12.5 = 21.875 miles
Based on your answer choices
Between 12 and 26 is the most correct answer
Answer Link
leyt013108 leyt013108
  • 21-04-2022

AnsweA jar contains 15 red​ marbles, 30 blue​ marbles, 10 green​ marbles, and 35 orange marbles. Find the probablilty of picking a green marble.r:

Step-by-step explanation:

Answer Link

Otras preguntas

On a scale drawing with a scale of 1/20, the height of a building is 3 feet. How tall is the actual building in feet?
What is the approximate tangential speed of an object orbiting Earth with a radius of 1.8 × 108 m and a period of 2.2 × 104 s? 7.7 × 10^–4 m/s 5.1 × 10^4 m/s 7
How much simple interest would you earn for 5 years at 7% with a beginning principal of $8,000.00 A. $2,800 B. $3,200 C. $3,300 D. $3,500 I couldn't figure it o
what multiplies to 330 and adds to 61
Quien fue el primer coreano
In word, how would you insert a section break in a document?
what is constructive superposition ? ( waves )
In the equation 1,500(B-15)=3,000, B equals
What is the difference between an invertebrate chordate and a vertebrate chordate
The strongest way to start a formal business document is with a . A. Question to answer B. Bottom-line statement C. Purpose st