All the members of a construction crew work at the same pace. Six of them working together are able to pour foundation in 22 hours. How many hours would this job take if the number of workers: increased 4 times

Respuesta :

jesseDO jesseDO
  • 10-11-2018
five and a half hours
Answer Link

Otras preguntas

solve this equation .6x-7=4x+13
278 divided by 2 the long way
Which victory convinced the French to join the war on the side of the colonists? A. Trenton B. Bunker Hill C. Saratoga D. Yorktown
What is 14.28 divided by 4.2
How many Japanese yen are equal to $100? How many Japanese yen are equal to $ 1000? How many Japanese yen are equal to $ 10.000?
A purpose is to have any of the following EXCEPT: A. an objective. B. a goal. C. an intention. D. a bad dream.
The tendency of water molecules to attract one another due to polarity is called _____.
Explain how multiplying with 6 is like multiplying with 3
In the ideal meritocracy, who should be paid the highest salaries? A. Those who perform the best B. Those who have the least C. Those with the largest families
Please help me with this math question!